Cloud migrations go wrong in predictable ways: big-bang cutovers, surprise bills, and rollback plans that exist only as a bullet point. Here is the sequencing we use to move production systems without drama.
Migrate the edges first
Start with stateless services and background jobs — the parts you can move, test and roll back in an afternoon. The database moves last, with dual-write or change-data-capture running for at least two full business cycles before cutover.
Put cost guards in on day one
Every environment gets budgets, alerts and automatic shutdown schedules for non-production before the first workload lands. We have seen unguarded dev accounts outspend production; a one-hour setup prevents it entirely.
Rehearse the rollback, then the launch
Each migration wave ships with a tested rollback runbook: who decides, what flips, how long it takes. We run game-day drills on staging, so cutover night is boring — boring is the goal.
Done this way, most of our migrations finish with zero customer-facing downtime and cloud bills 20–30% below the first estimate, because rightsizing happens during the move, not after.